What are you searching for?

Popular searches...

Find SolutionsOur OfferingsCustomer StoriesFind a Contractor
Contact Us
Home » Resources » Glenbrook Industrial Park solar installation will produce annual savings of $51,440 each year.
Customer Story

Glenbrook Industrial Park solar installation will produce annual savings of $51,440 each year.

It’s extremely important that we are saving energy and saving money at the same time. It’s in everybody’s best interest, and it’s the right thing to do.
— George Snead, Wakefield Design Center, Tenant at Glenbrook Industrial Park

Through Spinnaker Real Estate Partners (managing partner and a principle investor), this industrial complex had energy upgrades financed using C-PACE, aligning with Spinnaker’s commitment to resilient and sustainable building practices. Built in 1943, Spinnaker saw potential in Glenbrook and redeveloped the 185,000 sq. ft. space into a modern home for makers, artisans, and manufacturing firms. C-PACE financing was used to install a 135kW solar PV rooftop system to create an efficient location that was attractive to tenants who prioritize sustainability, while lowering their operating costs. Across a portfolio of 3 solar projects financed with C-PACE, Spinnaker will have annual energy savings of $203,700, amounting to $4,074,005 in total energy savings over financing term.

More from this story

Location

Glenbrook Industrial Park • Stamford, CT

Energy Update

135 kW roof mounted solar photovoltaic system and roof upgrades

Total Loan Amount

$413,981 • Over 20 years

Projected Energy Savings

$1.02 million • Over the life of the upgrades